Monday, 21 September 2009

Film festival (Promo Video)

Monday 21st September


Today I arrived at Long Road College, at 8am to collect the hard drive with the archive footage on from Nick. I needed the hard drive with the archive footage on, so i could import the footage into our promo video for the festival.

Once i had found the Hard drive and collected all that i needed from the media office at Long road, i then traveled to Coleridge, to start my day editing with Ash.
I arrived at Colerdige at 9.10am and soon got too work on the promo video.

It wasnt long after we started editing that we found a problem, that problem being that the archive footage is mainly in black and white, and we needed coulour footage for the promo video, but me and ash soon over came this problem by searching futher into the hard drive. Where we found some colour footage of archive, from around 1970ish.

Once we found the footage we needed to place into the windows on the promo video we got to work on editing all the seaperate videos int o black and white and we also editined the contrast and brightness on some of the shots, as some for example were too bright or dark due to the sun glare, so we editied the contrast on them shots.

Once we touched up the footage and also chose the final archive to place into the windows, we started to edit paths around the archive footage ready to be put into the windows on each of the shots.

The only other pronblem we faced was when we exported the video to after effects from final cut the videos were not propperly de-interlaced so the videos had a double vison type look to them. But this problem was soon solved when we simply de-interlaced all the clips by highlighting them all and pasting on the "de-interlace" effect to them all.


Overall today went well, and we done what we possibly could in order to make the project as close to complete as possible. We will continue our work on the promo video on wednesday at 9am when dave will be with me and ash to complete the promo video for the festival. (Or though it may not be published before the festival is over i still believe that this video will contribute strongly to my blog / portfolio and the work experiance, and will also benifit the film festuval organisers as they can use this for future screenings, also this video can be manipulated and changed to suit other projects such as the one set by matt on sunday, which was to create a video or booklet or anything else we can think of which will show future sponsers what they can get out of sponsering the festival in Cambridge, and also to sell the festival to them.


Here are some photos i took of todays editing session at Coleridge:




The hours i worked today was from 8-12ish.

The plan for tomorrow is for me to go to the film festival to get more hours work experiance done.

my chosen hours are from 13.00-18.00 ( i would of done the earlyer time slot, but i cannot do the early hours as i will be filming a sports awards ceromoney with my cousin tomorrow at his univerity / college, i will be doing this in the morning at around (9-12ish).

so therefore will not be available for the early time slots. (9.00-13.00)
so instead i will do (13.00 - 18.00)


Shown below are the hours ive worked so far for work exp...


12hrs + 12hrs for channel four work experiance = 24hours

wednesday 16th (shooting the promo and editing) = 6 hours

Thursday 17th (At pic house) (handing out flyers and doing lanyards etc ) = 2 hours (3 hours editing the promo video at home) ( 5 hours )

Friday 18th (at long road) (meeting with David about the rough cut + editing work to promo video) = 3 hours

Saturday 19th = 1 hour editing the music for promo and contacting people (dave in portugal about promo)

Sunday 20th = 0 hours

Monday 21st = 4 hours (Editing the promo video with Ash at coleridge)


Total hours so far = 37 hours

No comments:

Post a Comment